Page 5
1. Align the bottom of the side panels (#3) to the pre-drilled holes located on the inner part of the base (#2). 2. Insert a total of 4 bolts (#A) into the inner pre-drilled holes and secure using a Phillips screwdriver. Insert threaded ends of levelers (#B) into the pre-drilled holes...
Page 6
Align the rear panel (#4) to the pre-drilled holes located along the back sides of the side panels (#3). From within, insert bolts (#A). Secure using a Phillips screwdriver. 1. Align the front door (#5) to the holes along the front sides of the side panels (#3).
Page 7
1. Place the top panel (#1) on top. 2. Insert a total of 4 bolts (#A) from beneath into the holes along each side of the top pa- nel. Secure using a screwdriver. 3. Insert 2 bolts (#C) into the top holes on the rear panel.
Page 9
1. Determine exactly where you want to drill a hole and mark the spot(s). Be sure that you hold the drill perpendicular to the wall so that the anchor will sit parallel. You should drill a hole that is approximately the same size as the anchor bolt (#I) itself. Insert anchor. 2.
Need help?
Do you have a question about the Petro CM-AC6261 and is the answer not in the manual?
Questions and answers