Installation
5.3 Installing the individual components
5.3.2

Installation of the sample gas line

The heatable sample gas line must be installed according to the gas flow diagram.
Beginning at the sampling probe, route the sample gas line in the direction of the
cabinet. Make sure there are no loops or pockets. For additional information, refer to the
manufacturer's instructions.
Connect the sample gas line to the associated connection on the outside of the cabinet
and connect the heatable sample gas line to the PTFE tube.