Mounting; Concrete Slab - Balboa Clim8zone Installation Manual

Hide thumbs Also See for Clim8zone:
Table of Contents

Advertisement

10

MOUNTING

CONCRETE SLAB

Follow these steps to mount the
CLIM8ZONE
unit to the platform.
TM
1 - Establish the location of the CLIM8ZONE
unit on the
TM
concrete slab.
DO NOT install the CLIM8ZONE
unit indoors.
TM
It is recommended that the CLIM8ZONE
unit be
TM
installed no more than 6.5 feet (2 meters) from the
Hot Tub.
Follow the minimum clearance requirements
(figure 3) to insure proper air flow.
2 - Each foot (figure 4, A) on the CLIM8ZONE
unit
TM
has a mounting hole. Clearly mark the center of
each mounting hole on the concrete slab. Move the
CLIM8ZONE
unit to make room for step 3.
TM
3 - Using the marks from step 2 as a guide, drill one
mounting hole for each foot into the concrete slab
(figure 4, F).
4 - Clean the mounting holes (figure 4, G) and the
cement slab, removing all dust and debris. If necessary
used compressed air to clean the mounting holes.
5 - Move the CLIM8ZONE
unit back into its final
TM
position, making sure the mounting holes in the cement
slab align with the corresponding mounting holes in
the feet.
6 - Place a foot pad (figure 4, C) under each foot..
7 - Install the washer (figure 4, B), expansion wedge
anchor (figure 4, E) and nut (figure 4, D) on each foot
(A). Make sure the expansion wedge nuts are fully
seated into the mounting holes (figure 4, H); use a
rubber mallet if necessary.
8 - Tighten each expansion wedge anchor by turning
the nut (figure 4, I).
Mounting hardware not included.
Balboa Water Group | Your Single Source Solution
A
Foot
Figure 4
Concrete
Ground
Slab
F
G
Concrete
Mounting
Slab
Hole
Expansion Wedge
Anchor
E
D
Nut
B
Washer
C
Foot Pad
H
I
INSTALLATION GUIDE
42391 Rev A
TM
11