Initial start−up, inspection and maintenance
Burner control unit
Program sequence during commissioning
A
Start command
B B'
Interval for flame to build
C
Burner operating position
achieved
C D
Burner operation
D
Controlled shutdown
Burner control unit LOA 24. ...
t1
Pre−purge time
t3
Pre−ignition time
t3n Post−ignition time in case
a flame builds
t4
Interval stage I II
tw
Dwell time
TSA Safety time during
process
18
1 qW Plug−in terminals on the
E Burner motor
F Solenoid valve stage 2
H Solenoid valve stage 1
N Ignition transformer
O Flame monitor
approx.13 s
approx.13 s
approx.15 s
approx.15 s
2.5 s
max.10 s
burner control unit