4. Installation

Installation of this machine shall be performed by trained and/ or qualified personnel
only. The owner/ installer is responsible obtaining any necessary permissions and/ or
permits. Follow all applicable codes and ordinances. Read and understand all safety and
installation information in this manual.
Before installation, remove all shipping materials and verify all components on the packing
list were received. Inspect the machine, all components, wiring and electrical connections,
hydraulic hoses and fittings for damage. If components are missing or damage is found contact
the manufacturer before continuing installation. If not being installed in a pit see Typical and
Alternative Pad Plan sections
Pinch points and Crush Hazards exist when moving and transporting the machine. Do
not enter under any equipment while moving or transport. Keep hands, feet, and loose
clothing away from moving equipment.
This machine must be installed on a solid, stable, level surface or machine will be
unstable and can lead to injury. Do not install on asphalt or other unstable surface.
Never enter beneath the platform unless the machine is unloaded and secured against
lowering using the maintenance device. See section 6.1 Maintenance Devices.
4.1

External Power Unit

External power units should be placed within thirty feet (hose length) of the machine to avoid
excess pressure drops. External power units must be protected from moisture and weather.
4.2

Pit Installation

1. Verify that the pit dimensions match the pit plan.
2. Verify that pit is clear of tools and other debris before lowering the machine into the pit.
3. Follow General Installation instructions to complete the installation.
Presto Lifts
To avoid death or serious injury:
Use appropriate lifting device to lift the machine. Use a load spreader
to lift the machine. Lift the machine using the provided lifting eye-bolts
only. Do not lift the machine by the platform.
This machine must be properly secured to the floor/ ground before
operation or the machine may be damaged.
High Voltage: Electrical service and installation must be performed by
trained and/ or qualified personnel. Lock-out/ tag-out the power source
before installation.
Electric motors create sparks. Do not install the power unit in an area
where flammable gases may be present.
All electrical components and the hydraulic power unit must be
protected from wet and/or dirty environments unless specifically
configured for such environments.
Do not install this machine in a pit unless the machine has been
designed for such installation. Shear points exist and can cause severe
injury. Platforms traveling below floor level may require guarding in
accordance with ANSI MH 29.1. Guarding must be installed before
operation.