4.4

Recommended Pad Plan

Use of a sump/drain for proper drainage and a conduit run for hydraulic/ electrical routing
in pad is recommended. If no sump/drain and conduit run is provided see Alternative Pad
Plan .
BASE
FRAME
PLATFORM
WIDTH
LAGS
NOTES:
CROSS HATCHING INDICATES AREAS OF
BASE FRAME THAT MUST BE SHIMMED
AND/OR GROUTED AFTER LEVELING OF THE
BASE FRAME TO ENSURE PROPER BASE
FRAME SUPPORT.
CONDUIT RUN IS RECOMMENDED FOR
ROUTING OF HYDRAULIC HOSES AND
ELECTRICAL WIRING.
2" ELECTRICAL CONDUIT USED WHEN 1/2"
HYDRAULIC HOSE, VENT LINE, AND
ELECTRICAL LEADS ARE TO BE INSTALLED
FROM POWER UNIT TO LIFT (BY
CONTRACTOR).
SURFACE MUST BE
SMOOTH AND LEVEL
2° SLOPE GRADE
AWAY FROM PAD
Presto Lifts
PLATFORM LENGTH
BASE FRAME
LAGS
CONDUIT ROUTE CAN BE
FROM ANY DIRECTION
INCLUDING FROM BOTTOM
OF PIT SUMP
12"
COUPLINGS FOR
HYDRAULIC
CONNECTIONS
Ø3/4" LAG HOLES FOR
Ø5/8" ANCHORS WITH MIN.
2000 LB PULL OUT.
(BY INSTALLER)
CONCRETE PAD MUST BE
WELL COMPACTED WITH
NO VOIDS
PAD DRAIN AS REQUIRED TO
PREVENT STANDING WATER
ON PAD (BY CONTRACTOR)
11
2" CONDUIT
12"
CENTER LINE OF BUMPER
POSTS TO BE ALIGNED WITH
EDGE OF PAD
6"
3"
36"
6"
CONCRETE PAD
THROW OVER
PLATE AREA
6"
2X
8" STEEL PIPE
FILLED WITH
CONCRETE TYP.
(BY CONTRACTOR)
48"
8"
36"