Step 7 - Convert To Horizontal And Connect Ductwork; (When Required) - Bryant Preferred Series Installation Instructions Manual

04-06 single package rooftop cooling only/electric heat unit with puron (r-410a) refrigeran
Hide thumbs Also See for Preferred Series:
Table of Contents

Advertisement

"B"
REQUIRED
SPREADER
BARS
UNIT
551J 04
551J 05
551J 06
NOTES:
1. SPREADER BARS REQUIRED — Top damage will occur if spreader bars are not used.
2. Dimensions in ( ) are in millimeters.
3. Hook rigging shackles through holes in base rail, as shown in detail "A." Holes in base rails are centered around the unit center of
gravity. Use wooden top to prevent rigging straps from damaging unit.
Step 7 — Convert to Horizontal and Connect
Ductwork (When Required)
Unit is shipped in the vertical duct configuration. Unit without
factory-installed economizer or return-air smoke detector
option
may
be
field-converted
configuration. To convert to horizontal configuration, remove
screws from side duct opening covers (see Fig. 10) and remove
covers. Use the screws to install the covers on vertical duct
openings with the insulation-side down. The panels must be
inserted into the notches on the basepan to properly seal. The
notches are covered by the tape used to secure the insulation to
the basepan and are not easily seen. See Fig. 11 for position of
the notches in the basepan. Seals around duct openings must be
tight. Secure with screws as shown in Fig. 12. Cover seams
with foil duct tape.
Field-supplied flanges should be attached to horizontal duct
openings and all ductwork should be secured to the flanges. In-
sulate and weatherproof all external ductwork, joints, and roof
or building openings with counter flashing and mastic in accor-
dance with applicable codes.
Do not cover or obscure visibility to the unit's informative data
plate when insulating horizontal ductwork.
REMOVABLE HORIZONTAL
RETURN DUCT OPENING COVER
REMOVABLE HORIZONTAL
SUPPLY DUCT OPENING COVER
Fig. 10 — Horizontal Conversion Panels
36"- 54"
PLACE ALL SEAL STRIP IN PLACE
(914-1371)
BEFORE PLACING UNIT ON ROOF CURB.
"C"
"A"
SEE DETAIL "A"
MAX WEIGHT
lb
kg
in.
700
318
74.5
830
377
74.5
865
393
74.5
Fig. 9 — Rigging Details
to
horizontal
ducted
DUCT END
DIMENSIONS
A
B
mm
in.
1890
36.5
1890
36.5
1890
36.0
NOTCHES
Fig. 11 — Location of Notches
Fig. 12 — Horizontal Duct Panels In Place
12
DETAIL "A"
C
mm
in.
mm
925
33.5
850
925
41.5
1055
915
41.5
1055
NOTCHES
BASEPAN
SCREWS
DUCT COVERS
SHEET METAL
FACE UP
BASEPAN

Advertisement