Start-Up Checklist - Bryant Preferred Series Installation Instructions Manual

04-06 single package rooftop cooling only/electric heat unit with puron (r-410a) refrigeran
Hide thumbs Also See for Preferred Series:
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or property when
completing the procedures listed in this start-up checklist, use good judgment, follow
safe practices, and adhere to the safety considerations/information as outlined in pre-
ceding sections of this Installation Instruction document.
I. PRELIMINARY INFORMATION
MODEL NO. __________________________________________________
JOB NAME ___________________________________________________
SERIAL NO. __________________________________________________
ADDRESS ___________________________________________________
START-UP DATE ______________________________________________
TECHNICIAN NAME __________________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
Compressor Amps 1
Compressor Amps 2
Supply Fan Amps
TEMPERATURES
Outdoor-air Temperature
Return-air Temperature
Cooling Supply Air Temperature
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Start-Up Checklist for 551J 04-06 Single Package Rooftop
Cooling Only/Electric Heat Unit
(Remove and use for job file)
L1-L2_____________
L1 _____________
L1 _____________
L1 _____________
_____________ °F DB (Dry Bulb)
_____________ °F DB
_____________ °F
L2-L3_____________
L2 _____________
L2 _____________
L2 _____________
_____________ °F Wb (Wet Bulb)
L3-L1_____________
L3 _____________
L3 _____________
L3 _____________
Form No: II551J-4-6-02
CL-1
Replaces: II551J-4-6-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Preferred 551j

Table of Contents