STEP 4
MOUNT DROPPER
Position, level, secure and flash the
dropper.
STEP 10
REGULATIONS
Read & adhere to the local & national
electrical and plumbing regulations.
STEP 16
REFIT PAD FRAMES
Refit pad frames before testing the
pump.
2
1
STEP 5
CONVEY COOLER
Convey the cooler to the roof.
Note! Always use 2 people when
handling manually.
Page 8
STEP 11
INLET SOLENOID
Fit solenoid.
Connect cable.
Connect water supply.
Install drain pipe.
Page 11
STEP 17
TEST PUMP
Turn on cooler and check water is evenly
distributed to all pads.
3
Page 16
STEP 6
POWER CABLES
Unhook the plug under the cooler.
Feed power cable down into dropper.
.
Page 9
STEP 12
DRAIN VALVE
Fit the drain valve.
Connect discharge system.
Connect cable to cooler electronics.
Page 12
STEP 18
COOLER SETTINGS
Where necessary, adjust
cooler settings to suit customer
requirements using the Controller.
Page 17
BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |
Page 9
A
B
C
D
E
Page 13
Page 17
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Breezair ezqBreezair exs

Table of Contents