Adjusting Mounting Rails And - Tripp Lite SmartRack SRTH6UB Owner's Manual

Vertical expansion rack
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 1
Configuration
Adjusting Mounting Rails and Cable Management Rails
WARNING: Do not attempt to adjust rails without assistance. Do not attempt to adjust rails while equipment is
installed in the unit. Do not attempt to use rails without screws installed (4 per rail).
The 4 mounting rails accommodate equipment with a mounting depth of 30 inches (762 mm). Do not adjust the mounting
rails unless your equipment requires a different mounting depth. The front and rear sets of rails can be adjusted independently
in ¼-inch (6 mm) increments for mounting depths between 4 inches (101.6 mm) and 42 inches (1066.8 mm).
1
Each rail is connected to the enclosure with 4 screws - 1 pair at the
upper beam
and 1 pair at the lower beam
A
2
Remove the screws connecting the ground wire to the equipment
mounting rail.
3
Remove the screws fastening each of the rear mounting rails to the
enclosure. (If adjustment of the front rails is required, you can also
remove the screws from the front rails.)
4
Slide the mounting rails to the desired depth and reattach them
using the screws you removed in Step 2. The rail attachment points
are numbered
to help you align each pair of rails at the same
A
depth.
The depth of the cable management rails can be adjusted using the same
method.
Note: Remember to reconnect the ground wires to the equipment mounting rails
using the attachment point located near the bottom of the unit. The attachment
point is marked with the ground connection symbol
.
B
.
11
A
B
1
2
8
3
4
A
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartrack srth12ubAg-0545Ag-0546

Table of Contents