LG LV-C362FLA0 Svc Manual page 30

Ceiling & floor type air conditioner
Table of Contents

Advertisement

4) Form the pipings
1. Wrap the connecting portion of indoor unit with
the Insulation material and secure it with two
Plastic Bands. (for the right pipings)
• If you want to connect an additional drain hose,
the end of the drain-outlet should keep distance
from the ground. (Do not dip it into water, and fix
it on the wall to avoid swinging in the wind.)
In case of the Outdoor unit being installed below
position of the Indoor unit.
2. Tape the Pipings, drain hose and Connecting
Cable from bottom to top.
3. Form the pipings gathered by taping along the
exterior wall and fix it onto the wall by saddle or
equivalent.
In case of the Outdoor Unit being installed above
position of the Indoor Unit.
2. Tape the Pipings and Connecting cable from
bottom to top.
3. Form the pipings gathered by taping along the
exterior wall, and make the trap prevent water
from entering into the room.
4. Fix the pipings onto the wall by saddle or
equivalent.
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Seal a small opening
around the pipings
with gum type sealer.
Trap is required to prevent water from entering
into electrical parts.
- 30 -
Drain hose
Taping
Pipings
Connecting
cable
Power supply
cord
Seal a small opening
around the pipings
with gum type sealer.
Trap
LGE Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents