Download Print this page

Precautions For Facilitate Elimination Of Defective - Panasonic P5K Operation Manual

Narrow pitch connectors onnector

Advertisement

05. Precautions for facilitate elimination of
defective products at inspection process
(1) Each time you start work, please proceed with inspection after sufficiently
verifying that there is no abnormality in the contacts of the inspection jig
connector or in the molded component.
(2) To ensure long insertion/removal life, periodically perform ion blowing and air
dusting to ensure that there are absolutely no foreign particles inside the
connector.
(3)
Buckling distortion may occur in the socket contacts if mating is repeatedly
forced when not positioned properly. If use is continued in this situation,
scratching may occur on the header post of the product. In such a case,
immediately replace with a proper socket.
If an issue is encountered, immediately replace the defective product. Also,
(4)
verify that all products in the same post-inspection lot are defect-free.
Panasonic Corporation
industrial.panasonic.com/ac/e/
Operation manual for Narrow pitch connectors P5K
©
- 20 -
Panasonic Corporation 2017
ACCTF29E-1 201708

Advertisement

loading