Schletter FixGrid East-West Installation Manual

Schletter FixGrid East-West Installation Manual

Short side/long side clamping

Advertisement

Quick Links

F i x G r i d E a s t - W e s t
(short side clamping)
F i x G r i d + E a s t - W e s t
(long side clamping)
INSTALLATION MANUAL

Advertisement

loading
Need help?

Need help?

Do you have a question about the FixGrid East-West and is the answer not in the manual?

Questions and answers

Summary of Contents for Schletter FixGrid East-West

  • Page 1 F i x G r i d E a s t - W e s t (short side clamping) F i x G r i d + E a s t - W e s t (long side clamping) INSTALLATION MANUAL...
  • Page 2 T h e sy stem is to be installed only with ballasting in acc ordance with static loads. You will re ceive these with the planning of your solar plant fro m the Schletter c onfigurator Risk of breakage! PV modules can be damaged if they are stepped on.
  • Page 3 U s e the current mounting instructions! A c c essible on our website: www.schletter-group.c om in the FixGrid18 section. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 4 T h e mounting times can be optimized by pre-assembling a series of base rails next to each other on mounting fra m e s with the module supports. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE...
  • Page 5 T h e mounting times can be optimized by pre-assembling a series of base rails next to each other on mounting fra m e s with the module supports. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE...
  • Page 6 A n additional surface protection mat should be positioned under joints of the base rails! • If the roof water drains off transversely, an almost unhindered drainage is possible. alway s c entered below bearing FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 7 • Secure splice in place using self drilling screws provided, 1 per base rail per splice. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 8 • Connec t the module cable acc ording to the plan. • Repeat steps up to the last module in the row. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 9 Ballasting fro m the c ombination of the 3 possibilities T h e information about ballasting can be obtained with the planning of your solar plant fro m the Schletter c onfigurator. Use fixing flaps to attach the parts of the surface protection mat to the additional trough.
  • Page 10 At the last ballast tray, the end has to be unfolded again. Further Information about our sys te m s can be found on our website: www.schletter-group.c om in the solar section under D ownloads. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc.
  • Page 11 (PER ONE OF THE TWO MODULES OF THE EAST -WEST CONFIGURATION) BALLAST EXAMPLES FIXGRID 10 (PER ONE OF THE TWO MODULES OF THE EAST -WEST CONFIGURATION) FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 12 (PER ONE OF THE TWO MODULES OF THE EAST -WEST CONFIGURATION) BALLAST EXAMPLES FIXGRID 10 + (PER ONE OF THE TWO MODULES OF THE EAST -WEST CONFIGURATION) FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 13 BALLAST EXAMPLES FIXGRID 5 + (PER TWO MODULES OF THE EAST-WEST CONFIGURATION) BALLAST EXAMPLES FIXGRID 10 + (PER TWO MODULES OF THE EAST-WEST CONFIGURATION) FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 14 C O M P O N E N T S RE COM M ENDED BY S C H L E T T E R F O R E QU I P O T E N T I A L B O ND I NG FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc.
  • Page 15 I n s t a l l a ti o n s, C a n a d i an E l e c t r i cal C o d e , P a r t 1 . FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc.
  • Page 16 2.Apply a liberal amount of c onductor on front and back side of module fra m e at mounting hole. Although not required, Schletter strongly re co m m e nd the use of conductor c ompound between the mounting surface s in order to better protect the c onnection in all environmental c onditions and pro m o te c onnection longevity.
  • Page 17 L oosen or re m ove top portion of groundinglog and insert grounding wire into appropriate groove. Gauge of Grounding Wire conductor FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 18 WAR N I N G ! T h e PV S ystem m u s t be shut dow n first if it needs any electrical maintenance. Improper maintenance m ay cause lethal electric shocks/ or burns. FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE...
  • Page 19 F I X Z- P R O F ILE S I N C L . T U R N - I N C O N N E C T O R Maximum permissible pressure values 5 4 0 0 kPa Maximum permissible tensile values 2 4 0 0 kPa FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 20 Q.PEAK DUO‐G5 B.LINE PRO L G4.1 B.LINE PLUS L G4.2 B.LINE PRO L G4.2 B.LINE PLUS BFR G4.1 B.LINE PRO BFR G4.1 FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 21 Q.PEAK DUO‐G6+ Q.PEAK DUO‐G6+/SC Q.PEAK DUO‐G7 Q.PEAK DUO‐G8 Q.PEAK DUO‐G8+ Q.PLUS DUO L-G5 Q.PLUS DUO L-G5.1 Q.PLUS DUO L-G5.2 Q.PLUS DUO L-G5.3 B10B68:B138 FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 22 LGxxxS1C‐G4 LGxxxS1W‐G4 LGxxxS2W‐A5 LGxxxN2T‐A5 LGxxxN1T‐V5 LGxxxN2T‐V5 LGxxxQ1C‐V5 LGxxxQ1K‐V5 LGxxxA1C‐V5 LGxxxN2T‐J5 LGxxxN1C‐V5 LGxxxN1K‐V5 LGxxxN1C‐N5 LGxxxN1C‐A6 LGxxxN1K‐L5 LGxxxN1K‐A6 LGxxxQ1C‐A6 LGxxxQ1K‐A6 LGxxxN2W‐L5 LGxxxN2W‐E6 LGxxxN2T‐E6 LGxxxN2T‐L5 FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 23 STPxxxS – A60U/Wfhb STPxxxS ‐ A72U/Vfh STPxxxS ‐ A72U/Vnh STPxxxS‐24/Vfw FIXGRID EAST-WEST I I400338 I V3 I INSTALLATION GUIDE I 12 - 2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc.
  • Page 24 TSM‐DEG15MC.20(II) TSM‐DEG18MC.20(II) TSM‐PE06H TSM‐PE15H TSM‐PEG06H TSM‐PEG15H.20 Glacier Series G3 WattPower WP-xxxM/G3-60H-V (325|330|335|340PC) YL260P|255P|250P|245P|240P-29b Yingli G reen Energy YL275P|270P|265P|260P|255P|250P-29b YL290D|285D|280D|275D|270D-30b YL300C|295C|290C|285C|280C|275C-30b YL325P|320P|315P|310P|305P|300P-35b YL340D|335D|330D|325D|320D|315D-36b FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 25 ZNShine ZXM6‐60‐xxx_M ZXM6‐H120‐xxx_M ZXM6‐H144‐xxx_M ZXM6‐HLD120‐xxx_M ZXM6‐HLD144‐xxx_M ZXM6‐HLDD144‐xxx_M ZXM6‐LD60‐xxx_M ZXM6‐LD72‐xxx_M ZXM6‐LDD72‐xxx_M ZXM6‐NH120‐xxx_M ZXM6‐NH144‐xxx_M ZXM6‐NHLD120‐xxx_M ZXM6‐NHLD144‐xxx_M ZXM6‐NHLDD120‐xxx_M ZXM6‐NHLDD144‐xxx_M ZXP6‐72‐xxx_P ZXP6‐H144‐xxx_P ZXP6‐HLD120‐xxx_P ZXP6‐HLD144‐xxx_P ZXP6‐LD72‐xxx_P FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I 12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE WITHOUT NOTICE...
  • Page 26 SCHLETTER NA INC. 5200 77 Center Drive Suite 250 Charlotte, NC 28217 Phone: +1 704 595-4200 Fax:+1 704 595-5210 CANADA: Phone: +1 519 946-3800 rooftopNA@schletter-group.com www.schletter-group.com...