Outdoor Unit - Panasonic CS-UC12QKD Service Manual

Table of Contents

Advertisement

10.3

Outdoor Unit

10.3.1 Install the Outdoor Unit
After selecting the best location, start installation to Indoor/Outdoor Unit Installation Diagram.
1
Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10 mm).
2
When installing at roof, please consider strong wind and earthquake. Please fasten the installation stand
firmly with bolt or nails.
10.3.2 Connect the Piping
10.3.2.1
Connecting the Piping to Indoor
Please make flare after inserting flare nut (locate at joint
portion of tube assembly) onto the copper pipe. (In case
of using long piping)
Connect the piping
Align the center of piping and sufficiently tighten the
flare nut with fingers.
Further tighten the flare nut with torque wrench in
specified torque as stated in the table.
10.3.2.2
Connecting the Piping to
Outdoor
Decide piping length and then cut by using pipe cutter.
Remove burrs from cut edge.
Make flare after inserting the flare nut (locate at valve)
onto the copper pipe.
Align center of piping to valve and then tighten with
torque wrench to the specified torque as stated in the
table.
Model
A
UC12***, UC18***,
540 mm
UC24***
Do not over tighten, over tightening may cause gas leakage.
Piping size
6.35 mm (1/4")
9.52 mm (3/8")
12.7 mm (1/2")
15.88 mm (5/8")
19.05 mm (3/4")
26
B
C
D
160 mm
18.5 mm
330 mm
Torque
[18 N•m (1.8 kgf.m)]
[42 N•m (4.3 kgf.m)]
[55 N•m (5.6 kgf.m)]
[65 N•m (6.6 kgf.m)]
[100 N•m (10.2 kgf.m)]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-uc18qkdCs-uc24qkdCu-uc12qkdCu-uc18qkdCu-uc24qkd

Table of Contents