I Hydraulic Connecti Ons - Zodiac Heat Line 20 Instructions For Installation And Use Manual

Table of Contents

Advertisement

2.2 I Hydraulic connecti ons

Respect the hydraulic connecti on directi on (see the indicati ons on the exchanger tank).
Correctly ti ghten the hydraulic connecti ons and check for leaks.
Check that the pipe system is cleaned before connecti ng anything.
Tip: calorie exchange opti misati on
The water from the heati ng source must be at constant temperature.
Respect the water fl ow directi on in the exchanger. If your installati on requires it, you may reverse the
pool's water circulati on directi on in the exchanger, see § "2.2.3 Adapti ng the heat exchanger to the
directi on of water fl ow (depending on the models)".
2.2.1 Heati ng system connecti on (a.k.a. primary)
• The primary circuit's spur must be upstream of any valves or pumps.
• Heat Line N: if the heati ng source is equipped with a circulati ng pump, a buff er bott le or relay
logic must be provided to stop the circulati ng pump and the heati ng source, or a system for
there to be no water return from the primary circuit in the exchanger when there is no water
circulati on in the secondary circuit.
- With insulated pipes,
- Fitt ed with a safety valve (pressure limited to 3 bars) and a correctly-dimensioned expansion chamber,
- The pipes must have automati c drains at their high points.
2.2.2 Pool system connecti on (a.k.a. secondary)
• 90° elbow fi tti ngs must not be installed directly at the exchanger inlet and outlet; leave at
least 25 cm of straight pipe to prevent chatt er of the fl ow controller armature.
- In PVC pipes Ø50 minimum,
- via a by-pass (recommended to simplify maintenance and mandatory if the water fl ow rate of the pool system is
greater than 22 m³/h).
2.2.3 Adapti ng the heat exchanger to the directi on of water fl ow (depending on the models)
Remove the cover from the electrical box and disconnect the regulator's two connectors to remove the cover.
Unscrew the 4 retaining screws from the electric box's support.
Rotate the heat exchanger and circulati ng pump 180 °.
Positi on, then secure the electric box support using the 4 retaining screws.
Reconnect the two connectors to the regulator.
Repositi on the electric box cover and secure it with the screw.
6
: pool water inlet valve (secondary circuit)
: pool water by-pass valve (secondary circuit)
: pool water outlet valve (secondary circuit)
: heati ng water inlet valve (primary circuit)
: heati ng water outlet valve (primary circuit)
: exchanger body
: pool circuit
: heati ng circuit
: circulati ng pump
: automati c bleeder
: solenoid valve (opti onal)
: water treatment
H0360800.D - EN - 2016-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heat line 40Heat line 70

Table of Contents