GE ZFMB26DRSS Installation Instructions Manual page 68

Table of Contents

Advertisement

Available languages

Available languages

REPLACE THE BASE GRILLE
7
Replace the grille by installing the two
Phillips head screws.
SET THE CONTROLS
8
Set the controls to the recommended
setting.
Installation Instructions
66
START THE ICEMAKER
9
Set the icemaker power switch to the
I (on) position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
Power
switch
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csms6ugf

Table of Contents