Download Print this page
Nordson Pro-Meter A2K Quick Start Manual
Nordson Pro-Meter A2K Quick Start Manual

Nordson Pro-Meter A2K Quick Start Manual

Advertisement

Quick Links

Pro-Meter® A2K D2K H2K
System Components
COMPONENTS REQUIRED FOR
INSTALL A TION
Preassembled Pro-meter A2K
D2K H2K System
 Clear air tubing 0.25 inch (6.35
mm)
Cups for collecting material
during bleed procedure -
approx. 3.0 oz. (85.05 g)
Dispense valve assembly
TOOLS REQUIRED FOR INSTALL A TION
Ratcheting wrenches
Adjustable wrenches
Box cutter - to cut crate tie straps
Hammer - to open crate
Metric hex keys
Metric socket set
Pry bar - to open crate
1
Quick Start Guide
P/N 7443490
© 2017 Nordson Corporation

Advertisement

loading

Summary of Contents for Nordson Pro-Meter A2K

  • Page 1 TOOLS REQUIRED FOR INSTALL A TION COMPONENTS REQUIRED FOR INSTALL A TION  Ratcheting wrenches  Preassembled Pro-meter A2K  Adjustable wrenches D2K H2K System  Box cutter - to cut crate tie straps  Clear air tubing 0.25 inch (6.35 ...
  • Page 2 Safety WARNING:  Safety glasses are to be worn at all times while installing, servicing, operating, or observing equipment. The sudden release of air or fluid can cause dam age to eyes.  Allow only qualified personnel to perform the following task s. Follow the safety instructions in this document and all other related documentation.
  • Page 3: Setup And Calibration

    Operator’s Card prior to operating the Pro-Meter A2K D2K H2K. 1. Supply electrical power to Pro-Meter A2K D2K H2K. Refer to the Electrical Circuit Drawing for additional information. 2. Supply at least 80-100 psi (5.516-6.895 bar) of clean shop air to the air manifold ports. Refer to the Pneumatic Circuit Drawing and Customer Product Manual for additional information.
  • Page 4 16. Select the High/Low Vol Outlets push button on the Valve Setup HMI Control Panel Screen to open the outlet valves. 17. Select the Level 1 Setup push button on the Valve Setup HMI Control Panel Screen. 18. From the Level 1 Setup Menu, select the Setup Login push button. 19.
  • Page 5: Pressure Sensor Calibration

    Lead/Lag Adjustment (A2K and H2K Dispense Systems) On systems equipped with a lag plate, it is imperative to correctly adjust the lead/lag bolt. Lead/lag adjustment is needed in instances where there is an extreme difference in viscosity regarding high and low volume materials.
  • Page 6 Recording System Configuration Data CAUTION: It is imperative to record default system settings prior to servicing certain system components. To prevent component damage and minimize downtime after replacing components, take photos of the HMI Setup Screens while the equipment is fully operational. The data reflected by the screen shots can be utilized to restore key system settings.
  • Page 7: Troubleshooting

    Troubleshooting These troubleshooting procedures cover only the most common problems. If you cannot solve a problem with the information given here, contact your local NordsonR representative for help. Problem Possible Cause Corrective Action Blocked material path Ensure material is passing through all hoses. Ensure air is on.
  • Page 8 Issued 06/17 Original copyright date 2017. Nordson and the Nordson logo All other are registered trademarks of Nordson Corporation. Pro−Meter is a registered trademark of Nordson Corporation. All other trademarks are the property of their respective owners.

This manual is also suitable for:

Pro-meter d2kPro-meter h2k