Initial Startup

For the first startup, it is advisable to connect a monitor,
keyboard, and mouse so that boot progress can be observed. For
headless operation after the first start up, a directly attached
monitor is not required.
After making the power connections, the IPC will power on
automatically. A few seconds after powering up, the RXi2-BP IPC
system UEFI Firmware banner and Emerson logo will display on
the screen. If the user does not see any error messages up to this
point, the RXi2-BP IPC is running properly and ready to be
configured for an application.
For more information on remote management DASH
functionality and UEFI Setup, please see the RXi2-BP Hardware
Reference Manual (GFK-3187).
If the RXi2-BP came with pre-installed software, the boot process
will continue to load the operating system and application
software.
Note:
If the RXi2-BP IPC does not perform as described above, some
damage may have occurred during shipment, or the IPC is not configured
properly. Please contact Emerson for technical support. (Please see the
contact information provided at the end of this document.)