Page 1
Quick Start Guide GFK-3221A Oct 2021 RXi2 – UP Industrial PC QUICK START GUIDE...
Page 3
Caution Notes as Used in this Publication WARNING Warning notices are used in this publication to emphasize that hazardous voltages, currents, temperatures, or other conditions that could cause personal injury exist in this equipment or may be associated with its use. In situations where inattention could cause either personal injury or damage to equipment, a Warning notice is used.
Page 4
Changes, modifications, and/or improvements to equipment and specifications are made periodically and these changes may or may not be reflected herein. It is understood that Emerson may make changes, modifications, or improvements to the equipment referenced herein or to the document itself at any time. This document is intended for trained personnel familiar with the Emerson products referenced herein.
Unpack and Inspect WARNING Before installing or removing any board or module, ensure that the system power and external supplies have been turned off. WARNING Do not apply power to the board if it has visible damage. Doing so may cause further, possibly irreparable damage, as well as introduce a fire or shock hazard.
Page 8
If evidence of damage or rough handling is found (usually in the form of bent component leads or loose socketed components), notify the shipping service as soon as possible and contact Emerson for additional instructions. Depending on the severity of the damage, it may be necessary to return the product to the factory for repair.
Page 9
Figure 1:RXi2-UP IPC Packaging RXi2 - UP Industrial PC Quick Start Guide GFK-3221A...
Handling WARNING If the RXi2-UP IPC operates with an enhanced ambient temperature up to 65°C (149 ° F), the surface of the enclosure, especially the heat sink, can reach a temperature of 85°C (185 °F) and above. Be careful and do not touch the RXi2-UP IPC with bare fingers.
Physical Connection Overview and Startup Depending on the model of your RXi2-UP IPC, the arrangement or quantity of the hardware connectors may differ from the images in this Quick Start Guide. The following information is for reference only. Figure 2: Rear Panel Arrangements...
Status LEDs The RXi2-UP IPC contains a set of status LEDs to indicate various functions. The CEC09 provides LEDs on the front panel, in a location near the power connector and power button. Figure 3: Status LEDs Table 1: Status LEDs...
Power Button The Power button powers on the RXi2-UP IPC. It is located on the front panel. Figure 4: Power Button Note: Use an appropriate tool for operation as needed. Pressing (short push) the power button triggers the operating system to shut down (Power State S5).
Ethernet Ports (Eth1, Eth2, Eth3, Eth4, Eth5) Five Ethernet interface ports are available on the RXi2-UP IPC. They are located on the front panel. Ethernet interface requires the use of a CAT 5 cable for proper operation with 100/1000Base-T. Figure 5: Ethernet Interface...
USB 3.0 Connectors Four USB channels are available at standard USB Type A connectors. Each pair of them is fused with 2 A, but for normal operation do not exceed 0.9 A per connector. Figure 7: USB 3.0 Connectors RXi2 - UP Industrial PC Quick Start Guide GFK-3221A...
Power Connectors The power inlet into the RXi2-UP IPC is a Phoenix contact Base strip - MSTB 2.5/ 3-GF - 1776702 connector. The corresponding plug is a type FKCN 2.5/ 3-STF - 1732975 from a Phoenix contact. Figure 8: Power Connector...
ATTENTION The power input is secured with one 10 A blow fuse. If the input power exceeds the limits, the fuse will be blown to protect all circuitry within the RXi2-UP IPC. Contact Emerson for a suitable replacement. Initial Startup For the first startup, it is advisable to connect a monitor, keyboard, and mouse so that boot progress can be observed.
Page 18
RXi2-UP IPC is running properly and ready to be configured for an application. For more information on UEFI Setup, please see the RXi2-UP Hardware Reference Manual (GFK-3047). If the RXi2-UP came with pre-installed software, the boot process will continue to load the operating system and application software.
Please connect the power cable, Pre-Installed monitor, USB keyboard, and mouse before powering-up Operating the system. Please consult the RXi2-UP Hardware System or Reference User Manual (GFK-3187) for details on how to Software) change the UEFI boot order and to install the operating system.
• Industrial PC is only pre-installed with runtime license. If you require an editor license to develop or edit a project, please contact Emerson sales to make a purchase. To start the runtime of a deployed Movicon.NExT project, please go to Start->Movicon.NExT->”project name”...
Demo Mode. This message is referencing the editor functionality only and is expected. If you need an editor license, please contact your Emerson sales representative to make your purchase.
In the case of a major software crash, the IPC will require a re-image of the Windows’s license files, which will have to be manually re-installed. Emerson Customer Care should assist with this re- installation. Please refer to GFK-3187, RXi2-BP User Manual for detailed instructions on obtaining and reinstalling the license files.
All Rights Reserved. We reserve the right to modify or improve the designs or specifications of the products mentioned in this manual at any time without notice. Emerson does not assume responsibility for the selection, use, or maintenance of any product.