Viessmann VITOPEND 100-W Installation And Service Instructions Manual page 54

10.5 to 24 kw and 13 to 30 kw. gas fired central heating and combi boilers for open flue operation. natural gas and lpg version
Table of Contents

Advertisement

Commissioning/service reports
Commissioning/service reports
Setting and test values
Static pressure
Supply pressure (flow
pressure)
= for natural gas E
= for natural gas LL/Lw
= for natural gas Ls
= for LPG
Tick gas type
Carbon dioxide content
CO
2
at the lower rated output
at the upper rated out-
put
Oxygen content O
2
at the lower rated output
at the upper rated out-
put
Carbon monoxide con-
tent CO
at the lower rated output
at the upper rated out-
put
Ionisation current
Max. output
54
Set value
Date:
By:
mbar
max.
57.5 mbar
mbar
17.4-25 mbar
mbar
17.4-25 mbar
mbar
10-16 mbar
mbar
42.5-
57.5 mbar
% vol.
% vol.
% vol.
% vol.
ppm
ppm
µA
min. 4 µA
kW
Commis-
Service
sioning

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wh1b

Table of Contents