Further details regarding the individual steps
1. Switch OFF the control unit ON/
OFF switch (the boiler shuts
down).
2.
Turn rotary selector "tr" fully
anti-clockwise.
3.
Release the screw inside test nip-
ple A, but do not remove it; then
connect the pressure gauge.
4. Open the gas shut-off valve. Start
the boiler.
Commissioning, inspection, maintenance
(cont.)
5.
Turn rotary selector "tw" fully
clockwise (leave at that position
briefly), then turn it back.
LEDs "tw" and "tr" flash
simultaneously.
6.
21