Econar GeoSource Vara GV Series Installation And Operating Instructions Manual page 18

Vertical and horizontal forced air
Table of Contents

Advertisement

Hanger P
Assembly
Figure
5
-
Horizontal Unit
Hanging
Bracket
Table
6
-
Controller
#20-1038
LED
Indicator Chart
Note:
ConcePtuaL
drawj-ng
only.
Please
foIlow directions
included
with
hanger
assembLy
kit for
proper
insr-allaiion.
Indicates
LP
switch
indicators latched
and resettable
ON while
water present
on sensor,
ASC period
with
fuse
or
removed.
AC
power applied
ASC indicator
on
for
4'
35"
on
initialization.
X
x
for
a
call
to run.
-
unit
or
Power
x
ASC indicator ON
for
30
to 60
seconds
after compressor
shutdown.
x
x
x
X
LP
-
before
x
x
x
LP (F/A
heating
-
after
call)
LP
switch
x
X
LP
delayed 90
seconds on
initial
call, then
ASC
and
LP
indicator ON while
switch is open
x
x
x
LP{,F7A
cooling
- aftor
call)
LP indicator
will
flash
if
switch
closed
during
ASC period.
Indicator
reset
after ASC period.
x
x
flash
ON=
HP
switch
x
x
HP (F/A
heating
-
before
call)
Lockout,
indicators latched
and resettable
by removing
power
X
x
x
HP
(F/A
heating
-
after
call)
x
x
Indicates HP switch
position (ON
=
open).
I{P
(F/A cooling
-
before
call)
x
x
Lockout,
indicators latched
and resettable
by removing
power
HP (F/A cooling
- after
call)
x
x
Indicates FP switch
position (ON
= open)
FP
(F/A
heating
-
before
call)
X
x
x
x
Lockout,
indicators latched
and resettable
by removing
power
FP
(F/A
heating - after
call)
x
FP switch disabled
in cooling
mode.
FP
(F/A cooling)
x
Indicator ON while
water present
on sensor
(optional).
Condensate
Overflow
Detector
(F/A
heating)
x
x
Indicator ON while
water
present on
sensor
(optional).
Condensate
Overflow
Detector
(F/A cooling
-
before
call)
x
Condensate
Over{low
Detector
(F/A cooling
- after
call)
x
x
X
16
for F/A cooling only (optional)
)
r,?
AP
5?
ASC
r*t${n*rl*N
LP
(F/A cooling
-
before
call)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents