Steinbach 8500 User Manual page 36

Hide thumbs Also See for 8500:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 29
Preparing the setup location
D
700 mm
E
1. Set up the heat pump
2. Lay the hoses from the water treatment system to the setup location of the heat pump (see Fig. E).
Make sure that there is no tension on any of the lines routed to the heat pump and that they are not
in the way.
36
2100 mm
exactly as it will be installed later.
1
700 mm

Advertisement

Table of Contents
loading

Table of Contents