Viessmann VITOSOL 200-T Installation Instructions Manual page 25

Vacuum tube collector based on the heat pipe principle.
Table of Contents

Advertisement

Pitched roof installation with rafter hooks
A total of 3 rafters are required across
the whole width. Leave the centre rafter
free.
A Rafter hook
B Mounting rail
Rafter spacing k in mm
600
700
800
(cont.)
B
A
90°
C Tube retainer
Projection h in mm
C
1.
400
300
200
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spe

Table of Contents