Wicksteed Activitynet14 Installation Instructions Manual

Advertisement

Quick Links

4m Activitynet14
Installation Instructions
Using Rubber Safety Surface
Product Overview
The Activitynet14 Activity Net has been designed to be used by children from 3
years of age and has been manufactured to exceed the European Playground Standard
EN11761-1:2017 and EN1176-11:2014.
The following installation instructions should be adhered to in order that the
equipment functions in a safe manner.
Contents
Page 2
Page 2
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Product Activitynet14
Special Points of interest
Polished stainless steel mast with
solid aluminium dome.
18mm diameter Nylon braided rope
with steel re-enforcement.
Galvanised foundation steelwork.
Netform 'HD' aluminium rope
connecting system.
Low Maintenance

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Activitynet14 and is the answer not in the manual?

Questions and answers

Summary of Contents for Wicksteed Activitynet14

  • Page 1: Table Of Contents

    Installation Instructions Using Rubber Safety Surface Product Overview The Activitynet14 Activity Net has been designed to be used by children from 3 years of age and has been manufactured to exceed the European Playground Standard EN11761-1:2017 and EN1176-11:2014. The following installation instructions should be adhered to in order that the equipment functions in a safe manner.
  • Page 2: Space Requirements

    Space requirements & Safety Clearances Installation instructions The Activitynet14 Activity Net is delivered in three sections. Section One is the polished stainless stell mast which is to be mounted over the central spigot of the foundation steelwork leaving the top of the mast to accept the aluminium dome.
  • Page 3: Foundation Requirements

    Once the correct position of the holes has been marked prior to excavation, The use of a datum peg (point (b)) is recommended in order to easily relocate the exact foundation position (both horizontally and vertically) which was originally established during setting out. Product Activitynet14...
  • Page 4: Foundation Setting

    Page 4 All dimensions to the centre of the hole in the anchor Safety Anchor The eye of the anchor is directly Safety anchor positioned over the front of the in hole at back of box concrete block Corner Foundation Hole: 1000x1000x800 Centre Foundation Hole: 800x800x800 Product Activiynet14...
  • Page 5: Excavation & Positioning

    Install the centre foundation spigot. bolted temporary timber supports to suspend and secure the anchor during concreting. Note: To easily remove the support timbers following concreting, secure the timbers by bolting from the underside of the spigots top plate. Product Activitynet14...
  • Page 6: Assembly Instructions

    4) Connect the second bow shackle on the loop of wire to th esafety anchor, this is a precausionary measure in case the rigging screw is tampered with or fails for any reason. 5) Finaly secure the corner boxes with their lids using the security bolts supplied. Product Activitynet14...
  • Page 7: Maintenance & Contact Details

    15 years for structural steel. This is particularly important for these structures that are subject to fluctuating loads as fatigue can occur over time, depending on the level of use and abuse. For further information and technical assistance, please contct the manufacturers at: Activitynet14...

Table of Contents