Download Print this page

Mercia Garden Products 03BRN0705-V5 General Instructions Manual

7x5 bournemouth summerhouse

Advertisement

Quick Links

General Instructions
03BRN0705-V5
7X5 BOURNEMOUTH SUMMERHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy or
extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment
to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions,
The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap
the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding
ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03BRN0705-V5 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03BRN0705-V5

  • Page 1 For assistance please contact customer care on: 01636 880514 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 03BRN0705-V5 Please retain product label and instructions for future reference Before assembly please make sure you have a Overall Dimensions: Overall Dimensions: suitable base ready to erect your building Length = 1768mm Length = 2233mm Width = 2291mm Width = 2291mm...
  • Page 3 Please retain product label and instructions for future reference Pre Assembly Step 3 Parts needed - No. 14 QTY 4 Remove the transportation blocks No. 15 QTY 2 from the bottom of each panel before beginning the assembly. Attach the window strips (No. 14 & 15) using 30mm screws as per the diagram.
  • Page 4 Please retain product label and instructions for future reference Step 5 Step 7 Parts needed - No. 2 QTY 1 Parts needed - No. 8 QTY 1 No. 3 QTY 1 No. 22 QTY 2 Place the Plain Gable (No. 3) and the rst Plain Place the Ridge Bar (No.
  • Page 5 Please retain product label and instructions for future reference Step 9 Step 11 Parts needed - No. 10 QTY 4 Place the assembled roof panels Attach the cover trims (No. 10) onto the building as shown in to each corner of the building the illustration.
  • Page 6 Please retain product label and instructions for future reference Step 14 Step 13 Parts needed - No. 25 QTY 1 Parts needed - No. 11 QTY 4 No. 16 QTY 2 Cut the felt (No. 25) into 3 sheets and lay onto Fix the fascias (No.
  • Page 7: After Treatment

    Please retain product label and instructions for future reference Step 16 Step 18 Parts needed - No. 20 QTY 1 Parts needed - No. 18 QTY 2 Fix the presslock (No. 20) to the inside of Fix the turn buttons (No.
  • Page 8 Please retain product label and instructions for future reference Step 8a Step 10a Parts needed - No. 32 QTY 2 Parts needed - No. 5 QTY 2 No. 33 QTY 2 No. 9 QTY 2 No. 28 QTY 2 Place Roof Truss Block A (No. 32) under the No.
  • Page 9 Please retain product label and instructions for future reference Step 12a Step 14a Parts needed - No. 26 QTY 1 Once the roof is xed in place, Place the Veranda Floor (No. 26) on secure the building to the oor using 18x50mm screws.
  • Page 10 Please retain product label and instructions for future reference Step 16a Step 18a Parts needed - No. 29 QTY 2 Parts needed - No. 25 QTY 1 Place the Veranda Frame (No. 29) Cut the felt (No. 25) into 3 sheets and lay underneath the roof overhang, aligning onto the roof as shown in the illustration the frame ush to edge of the veranda...
  • Page 11 Please retain product label and instructions for future reference Step 19a Step 21a Parts needed - No. 11 QTY 4 Parts needed - No. 20 QTY 2 No. 16 QTY 2 Fix the presslock (No. 20) to the inside of Fix the fascias and nials to the the master door, making sure to align the building using 8x40mm screws...
  • Page 12 Please retain product label and instructions for future reference Step 23a Parts needed - No. 18 QTY 2 Fix the turn buttons (No. 18) into place at the top and bottom of door as shown in the diagram. The turn buttons help to keep the doors alligned during high and low levels of moisture.
  • Page 14 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...