Viega Grundfix Plus Instructions For Use Manual page 24

Table of Contents

Advertisement

Grundfix Plus Control backflow trap type 3
Fill water to the top marking of the test funnel.
When the pressure switch is intact, the control will report a back
flow:
Display: [Test NRV closed] , [Back pressure NRV closed]
If necessary, a positive opening is possible. Press the button T3
for 5 seconds.
Keep the water level in the test funnel constant for 10 minutes by
replenishing. Observe loss.
If the loss is greater than 0.5 l, check and, if required, replace
the seals on the flaps.
Set the emergency lock to "AUF" (ON) position.
The water drains away.
Display: [Test NRV closed]
Open the motor-powered flap by pressing button T2.
Remove the test funnel.
Screw in the brass plug.
The control automatically changes back to normal operation
after a successful procedure.
Display: [Normal operation / NRV opened]
Handling
24

Advertisement

Table of Contents
loading

Table of Contents