6 - 8
•
Assembly is performed in the reverse sequence.
•
Check the capacitor voltage (Uc) and the charging time (refer to "Capacitor voltage (Uc)
and charging time ", page 5-3)
SMS Iselin / O'Donnell
TD SD 24 / Am-Ende
TD SD 24 / Groß
POLYMOBIL Plus
Replacing important components
SPR8-125.061.02
Rev. 01
01.00
Page 8 of 8
TD SD 24
Medical Engineering
Siemens AG