Graco Z-Pump Elite Series Instructions Manual page 19

Table of Contents

Advertisement

40cc Pump
148
149
107
101
103
133
135
134
146
121
4
119
9
10
6
1.
Lubricate seals, o-rings, lead-in's and moving parts with
grease.
2
Apply one stripe of removable strength anaerobic sealant on
threads.
Specification sheets and Graco testing indicate that
anaerobic sealant requires three days to fully cure. Failure
to allow three days for full cure may result in damage to
the equipment from parts coming loose during operation.
If faster cure time is required, warm components to 104° F
(40° C) for 6 hours.
3
Torque to 50-ft-lbs (67.5 N•m).
4
Assemble and torque after displacement rod (115) is
assembled through throat retainer (119). Torque to 45 ft-lbs
(61.01 N•m)
5
Torque tie bolts (105) in star pattern ( F
ft-lbs (13.5 N•m). Then torque again to 50 ft-lbs (67.5 N•m).
Finally torque to 200 ft-lbs (271 N•m).
3A8563B
102
101
2
147
115
125
145
126
8
10
118
8
NOTICE
. 26 page 17) to 10
IG
113
9
13
108
112
111
110
108
104
112
102
111
110
124
117
2
116
11
114
12
7
106
120
6
Torque to 200 ft-lbs. (271 N•m).
7
See Piston Retainer Torque Specifications table on page 15
for torque specification.
8
Must be pressed straight into housing.
9
Apply anti-seize lubricant to threads.
10
Ensure spring side of one throat seal (126) faces throat
cartridge (118) and spring side of other seal faces throat
retainer (119).
11
Ensure spring side of one piston seal (117) springs face
displacement rod (115) and piston bearing retainer (116).
12
Fully assemble piston seals(117) and piston bearing retainer
(116) onto pump rod bottom (124) before tightening piston
retainer (114)..
13
Torque to 70 ft-lbs. (95 N•m).
109
109
108
105
5
Parts
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

L020s8L040s8L080s8L100s8L120s8L160s8

Table of Contents