Step 6 - Commissioning - Zenith HydroTap G5 Installation Instructions Manual

Hide thumbs Also See for HydroTap G5:
Table of Contents

Advertisement

Step 6 – Commissioning
Do not commission your HydroTap until it is ready to be used! The HydroTap is
designed to be installed, commissioned and used within 48 hours.
If the HydroTap is left idle before use, a filter change and sanitisation may be required.
The filter cartridge must be installed at commissioning. A new filter
6.1
cartridge is provided, inside the filter door.
Unpack new filter
cartridge. Moisten
the top O-ring with
tap water. Do not
touch!
Write today's
date on label.
Familiarise yourself with operation of the Tap
6.2
(refer to User Guide). Turn water ON.
Connect the electrical cables plugs from the
HydroTap to 2x 220-240V AC, 10A power outlets.
Turn electrical power ON at both the power outlets.
Refer to the LCD screen. Select language. Check the date and time
6.3
settings. The screen will continue to Filter Flush.
New filter cartridges must be flushed before use. Follow the steps on the
screen to flush the filter for approximately 2 minutes. This step cannot be
skipped.
Once complete, press NEXT.
Commissioning
Align the key tabs
and insert the new
cartridge upwards
into the filter head.
Turn the cartridge to
the right until it locks
into place.
807042NZ v1.00 03.21 HydroTap G5 UltraCare Install Instruct
10L
(bucket not
supplied)
1
1
2
ON
Open valve to
let water flow
Close valve
when complete
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultracare bcu40

Table of Contents