Step 4 - Command Centre Installation - Zenith HydroTap G5 Installation Instructions Manual

Hide thumbs Also See for HydroTap G5:
Table of Contents

Advertisement

Step 4 – Command Centre installation
Connect electrical cable to the
4.1
side of the Command Centre.
Power must remain OFF until
commissioning.
Mains water connection
4.3
Flush water supply lines before any plumbing connections are
!
made, to prevent sediment from affecting operation.
Installation instructions
No Mixer
Command
Centre
MAINS IN
Mains water
(isolation valve
not supplied)
807042NZ v1.00 03.21 HydroTap G5 UltraCare Install Instruct
4.2
Connect the USB
cable from the tap
to the USB cable
plug from the
Command Centre.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultracare bcu40

Table of Contents