American Standard PFWF071A93ABA Installation Manual page 32

Oil fired water boiler with three pass cast iron heat exchanger
Table of Contents

Advertisement

Oil Burner Installation Instructions
Models BAYRBF03ABURNA (BF3) and
BAYRBF05ABURNA (BF5)
CAUTION
!
Before opening the boiler door, disconnect burner
cord at the plug.
NOTE: The burner settings used in this manual
were obtained under laboratory conditions and may
vary from those obtained in the actual installation
of the burner. Combustion results must be veri-
fi ed using proper combustion test equipment. The
manufacturer of the burner and boiler will not be
responsible for the improper installation or set-up
of the appliance.
It is mandatory that a combustion analysis be
conducted at initial startup and at least annually as
part of boiler maintenance. Analysis should include
smoke number, CO2 % and CO ppm.
BAYRBF03ABURNA, BAYRBF05ABURNA OIL BURNER TECHNICAL DATA
A
Table 8
DIMENSIONS
MODEL
BAYRBF03ABURNA 9-13/16 (249) 11-1/4 (286)
BAYRBF05ABURNA 9-13/16 (249) 11-1/2 (292)
18-CG03D1-4
32
B
Figure 30
A in.(mm)
B (in./mm)
PACKAGE LIST
Your Riello BAYRBF03ABURNA (BF3) or
BAYRBF05ABURNA (BF5) burner should include
the following parts. Please check to make sure all
parts are present before beginning the installation.
QTY. DESCRIPTION (parts bag)
1 - Burner assembly with factory assembled, pre-
wired, wiring harness with 7 pin polarized plug
1 - Mounting Gasket
1 - Installation Manual
1 - Parts Bag, including:
1 - NPT - NPFT pipe adapter
1 - By-pass plug
Nozzle(s) as follows:
(BF3) 1 - Delavan Nozzle 0.55x80° B
(BF5) 2 - Delavan Nozzles, 1.00x60° W
E
D
C
C (in./mm)
D (in./mm) E (in./mm) F (in./mm)
7-1/2 (193)
3-1/2 (89)
7-1/2 (193)
3-1/2 (89)
and 1.20x60° B
F
2 (51)
16-1/4 (413)
2 (51)
16-3/4 (425)

Advertisement

Table of Contents
loading

Table of Contents