Advertisement

Quick Links

®
VWR
Instruction Manual Pipettors
VWR Standard Line
VWR 8-channel Standard Line
VWR 12-channel Standard Line
This manual is available in additional
languages at
PMS 647C
CMYK 96/54/5/27
Standard Line
www.vwr.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the avantor and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for VWR avantor

  • Page 1 ® Standard Line Instruction Manual Pipettors VWR Standard Line VWR 8-channel Standard Line VWR 12-channel Standard Line This manual is available in additional www.vwr.com languages at PMS 647C CMYK 96/54/5/27...
  • Page 2: Table Of Contents

    0.1 μL to 10,000 μL. 2. Packing .................. 4 The VWR Standard Line 8-channel and 12-channel 3. Pipettor design  .............. 4 pipettors are designed for microplate filling. The pipet- tors enable precise and simultaneous delivery of 8 or 12 4.
  • Page 3: Packing

    • after replacing the plunger or the shaft, the pipettor should be calibrated. • in the case of incorrect operation, the device should be cleaned in accordance with the instruction Manual or transferred to a service point. 4 – VWR STandaRd Line PiPeTTORS instruction Manual – 5...
  • Page 4: Specifications

    ±0.8 ≤0.3 20°C ± 1°C according to en iSO 8655 standards. The use of tips from other manufacturers or filter tips may result in incorrect liquid aspiration and require pipettor recalibration. 6 – VWR STandaRd Line PiPeTTORS instruction Manual – 7...
  • Page 5: Pipettor Operation

    3. Tip ejector adjustment • Remove the tip ejector pushbutton. • To increase the ejector length turn the plastic bush counter-clockwise. • To decrease the ejector length turn the plastic bush clockwise. 8 – VWR STandaRd Line PiPeTTORS instruction Manual – 9...
  • Page 6 Before reaching the desired value, reduce the shaft and slide the cap upwards to the bottom of the speed of turning the adjustment knob to avoid inadver- tip ejector. tently exceeding the desired value. 10 – VWR STandaRd Line PiPeTTORS instruction Manual – 11...
  • Page 7: Operating Instructions

    Remember to change the pipet tip whenever the shaft and rinse the plunger and O-ring with distilled a different type of liquid is to be sampled. water after finishing the pipetting operation. 12 – VWR STandaRd Line PiPeTTORS instruction Manual – 13...
  • Page 8: Checking Pipetting Accuracy Parameters And Pipettor Recalibration

    The pipettors are designed to enable recalibration and be taken into account. Sample values of conversion adaptation to different pipetting techniques and liquid factors are given in the following table. properties (e.g., temperature, density, and viscosity). 14 – VWR STandaRd Line PiPeTTORS instruction Manual – 15...
  • Page 9 19.4 - 20.6 6.30 0.262 erably different from those of water, follow the guidance 49.2 - 50.8 10.00 0.42 given in Section 5. More information on the calibration procedure can be found at www.vwr.com 16 – VWR STandaRd Line PiPeTTORS instruction Manual – 17...
  • Page 10: Pipettor Maintenance

    • Check the calibration of the pipettor after the first, third, and fifth autoclaving cycles and then after every 10 autoclaving cycles. 18 – VWR STandaRd Line PiPeTTORS instruction Manual – 19...
  • Page 11: Spare Parts

    Before returning the pipettor, please ensure the pipettor SP19125 is completely free of any chemical, radioactive, or micro- 1,000 SP19127 biological contamination which could pose a threat 5,000 SP19128 during transport and repair. 10,000 SP19129 20 – VWR STandaRd Line PiPeTTORS instruction Manual – 21...
  • Page 12: Technical Service

    VWR warrants that this product will be free from defects Plunger assembly in material and workmanship for a period of three (3) SP19385 years from date of delivery. if a defect is present, VWR 1,000 SP19386 will, at its option and cost, repair, replace, or refund the...
  • Page 13 Belgium India Poland VWR international BV VWR Lab Products Private VWR international Sp. z o.o. Researchpark Haasrode 2020 Limited Limbowa 5 Geldenaaksebaan 464 no.139. Bda industrial Suburb, 80-175 Gdańsk 3001 Leuven 6th Main, Tumkur Road, Tel.: +48 058 32 38 210...

Table of Contents