Installation; Preliminary Operations - CAME BX704AGS Installation Manual

Sliding-gate operators
Hide thumbs Also See for BX704AGS:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

The following illustrations are examples only. The space available for fitting the operator and accessories varies depending on the area where it is
installed. It is up to the installer to find the most suitable solution.
The drawings show an operator fitted on the left.

Preliminary operations

Dig a hole for the foundation frame.
Set up the corrugated tubes needed for the wiring coming out of the junction pit.
Use Ø 40 mm corrugated tubes to connect the gearmotor to the accessories.
The number of tubes depends on the type of system and the accessories that are going to be fitted.
Laying the anchoring plate
Set up a foundation frame that is larger than the anchoring plate.
Insert the foundation frame into the dug hole.
The foundation frame must protrude by 50 mm, above ground level.
Fit an iron cage in the foundation frame to reinforce the concrete.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bx708agsBx708rgsBx704alsBx708als

Table of Contents