Procedure
Step 1.
Extend each of the four leveling pads in turns until they firmly contact the floor and support the rack
cabinet. Make sure the cabinet is balanced by gently pushing the cabinet. If it tilts, adjust the length
of the leveling pads until the cabinet is well balanced.
Figure 149. Lowering the leveling pads
Step 2.
Remove the outrigger stabilizing bars, and remove them.
Figure 150. Removing the outrigger stabilizing bars
Remove the eight screws that secure the two bars to the rack cabinet.