Lenovo ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Manual page 100

Table of Contents

Advertisement

Figure 108. Inserting the air-purging tool extension hose
Step 7.
Attach the air-purging tool to the drain valve at the bottom of the heat exchanger, and place the
drain end into a 2-liter (or larger) container to catch the water.
Figure 109. Draining water
Step 8.
When the water is drained completely, Remove the air-purging-tool extension hose from the valve.
96
ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide

Advertisement

Table of Contents
loading

Table of Contents