Target TWO PEOPLE REQUIRED Jamie Single/Single Bunk JY-1503 Assembly Instructions Manual
Target TWO PEOPLE REQUIRED Jamie Single/Single Bunk JY-1503 Assembly Instructions Manual

Target TWO PEOPLE REQUIRED Jamie Single/Single Bunk JY-1503 Assembly Instructions Manual

Advertisement

Quick Links

JY-1503
TWO PEOPLE
Jamie Single/Single Bunk
REQUIRED

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TWO PEOPLE REQUIRED Jamie Single/Single Bunk JY-1503 and is the answer not in the manual?

Questions and answers

Summary of Contents for Target TWO PEOPLE REQUIRED Jamie Single/Single Bunk JY-1503

  • Page 1 JY-1503 TWO PEOPLE Jamie Single/Single Bunk REQUIRED...
  • Page 2 PAGE 1...
  • Page 3: What You Need

    What you need To assemble the Product GUARD RAIL BED SLAT REAR GUARD RAIL SUPPORT (P10) (P8) (P7) DO NOT USE UPPER REAR Other tools you need HEADBOARD GUARD RAIL Philips Head Screwdriver (P2) (P5) PARTS LIST UPPER FRONT GUARD RAIL FOOTBOARD (P1) (P9)
  • Page 4: You Will Need

    Step 1: You will need 4 x HEXAGON SCREWS 4 x BARREL NUTS ALLEN KEY (H9) Attach lower side rails (P6) to lower footboard (P3) by using 4 x hexagon screws (H1) with 4 x barrel nuts (H2). but DO NOT fully tighten screws. Step 2: You will need You will need...
  • Page 5 Step 3: Phillips Head Screwdriver (Tools not provided) You will need 24 x SCREWS (H8) 4 x METAL DOWELS (H7) (H8) (H8) Attach the 12 bed slats (P10) to lower side rails (P6) with 24 x screws (H7) by using philips Head Screw driver. Insert 4 metal dowels (H8) into the holes of headboard and footboard posts.
  • Page 6 Step 5: You will need (H9) (H3) 8 x HEXAGON SCREWS ALLEN KEY (H9) Attach 2 guard rail support (P7) to the 2 front guard rail (P9) and upper front side rail (P4) by using 8 x hexagon screws (H3). But do not fully tighten screws. Step 6: (H1) You will need...
  • Page 7 Step 7: You will need 8 x HEXAGON SCREWS 8 x BARREL NUTS ALLEN KEY (H9) (H1) (H2) (H2) (H2) Attach upper headboard (P2) to upper rear side rail (P5) and upper front side rail (P4) by using 8 hexagon screws (H1) with 8 barrel nuts (H2).
  • Page 8: Two People

    TWO PEOPLE Step 9: REQUIRED (H5) (H5) Using 2 people lift upper level Bunk into position. Be careful of your fingers! Step 10: You will need 2 X METAL HOOK S OF LADDER (H4) 4 x SCREWS 6 x JCBC SCREWS ALLEN KEY (H9) (H6)
  • Page 9 Step 11: You will need (H5) 2 x SCREWS (H5) Phillips Head Screwdriver (Tools not provided) Attach the ladder to upper front side rail (P4) using 2 x screws (H5) from inside and tighten screws by using philips Head Screw driver. Job completed! in the interest of our environment please dispose of all packing thoughtfully.

Table of Contents