Maico Centro-M-APB Installation And Operating Instructions Manual

Maico Centro-M-APB Installation And Operating Instructions Manual

Surface-mounted system for centralised ventilation, in accordance with din 18017-3

Advertisement

Quick Links

Installation and operating instructions
Surface-mounted system for centralised ventilation, in ac-
cordance with DIN 18017-3
www.maico-ventilatoren.com
Centro-M-APB
Centro-E-APB
Centro-H-APB

Advertisement

Table of Contents
loading

Summary of Contents for Maico Centro-M-APB

  • Page 1 Installation and operating instructions Surface-mounted system for centralised ventilation, in ac- cordance with DIN 18017-3 Centro-M-APB Centro-E-APB Centro-H-APB www.maico-ventilatoren.com...
  • Page 2: Table Of Contents

    Table of contents 15 Fault rectification........20 Table of contents 16 Spare parts ..........21 Scope of delivery ........17 Removal..........21 Specialist installer qualifications ..18 System and accessory components ... 22 Intended use.......... 19 Environmentally responsible dis- General safety instructions ....posal ............
  • Page 3 Preface Please read the instructions carefully before in- Preface stalling and using for the first time. Follow the in- structions. Pass these instructions on to the owner for safekeeping. Overview of Centro APB system...
  • Page 4: Scope Of Delivery

    1 Scope of delivery recognise and avoid risks and dangers associ- Cover ated with electricity on the basis of your technical G2 air filter training and experience. Upper part of housing 3 Intended use ER EC fan insert Centro-APB exhaust air elements are intended for Humidity sensor (only H model) use in central ventilation systems with a common Lower part of housing...
  • Page 5 5 Safety instructions regarding installation, operation, cleaning and maintenance NOTICE Damage to unit due to grease and oil DANGER Danger if the relevant regula- vapours from range hoods. tions for electrical installations are not ob- Grease and oil vapours from range hoods may served.
  • Page 6 5 Safety instructions regarding installation, operation, cleaning and maintenance DANGER Danger due to fire transmis- WARNING Risk of injury when working at sion: heights. if an incorrect connection duct is connected to the Use appropriate climbing aids (ladders). housing. Always use the correct duct material for Stability should be ensured, if necessary have the respective housing.
  • Page 7: System And Product Information

    [} 22]. 6.3 Exhaust air elements 6.4 Product features Centro-M-APB • Filter change is indicated via time strip (→ Title Manual model. For use in systems with jointly page). variable volumetric flows. Fixed air volume setting...
  • Page 8: Installation Conditions

    Ambient temperature – 10 °C to + 60 °C. from the kitchen, bathroom or WC. Maico accepts no liability for corrosion damage caused by improper storage, e.g. storage in a damp environment.
  • Page 9: Mounting Preparations

    8 Mounting preparations 8.2 Permitted installation positions: 8 Mounting preparations Suitable mounting material is to be Wall installation, top left corner of room provided by the customer. 8.1 Requirements in line with ap- proval 8.1.1 Approval provisions Approval provision Centro-APB Number of units per floor, res- Max.
  • Page 10: Preparations For Installation With Fire Protection Requirements

    8 Mounting preparations 1. Correctly attach main ventilation duct inside 8.3 Preparations for installation with the shaft. fire protection requirements 2. Apply ceiling compound. To do this, encase NOTICE Damage to unit, malfunctioning in the the ceiling and pour in the material from event of corrosion damage from mortar.
  • Page 11 8 Mounting preparations Main duct (steel folded spiral-seams Duct attachment with duct clamp, duct) alternatively duct attachment with clamping band Spigot Shaft wall Ceiling compound Floor ceiling Steel threaded rod / stair bolt Duct attachment Duct clamp / clamping band Steel folded spiral-seams duct Wall/wall board seal Suspended ceiling...
  • Page 12: Preparations For The Electrical Connection

    8 Mounting preparations 8. Make the DN 80 opening for the unit connec- DANGER Danger to life due to fire trans- tion socket in the suspended ceiling (fire res- mission in case of faulty ceiling compound. istance is not required). It is essential to ob- It is essential that the remaining gap between the serve the permissible installation positions: main duct and the wall or ceiling is completely...
  • Page 13: Housing Installation

    9 Housing installation With metal exhaust socket and metal shut-off DANGER For connection outside the shutter and soldered strut with soldered strut lock- shaft: Danger to life due to fire transmission if ing device. This is approved for a PAM-GLOBAL the metal exhaust socket is incorrectly con- RML cast iron ventilation duct system or a system nected to the connection duct.
  • Page 14 9 Housing installation 2. Mark fixing holes on wall: 3x fixing holes for Lower part of housing lower part of housing. For APB, also 1x fixing Cable grommet hole for tab of metal exhaust socket. It is es- Metal connection socket with shut-off sential that the permissible installation posi- device tions are observed.
  • Page 15: Ceiling Installation, Lower Part Of Housing

    9 Housing installation 7. Guide the power cable into the terminal com- Prescribed mounting material partment such that the cable grommet fits Steel screw Steel dowel around the cable sheathing completely. Masonry or ● ● DANGER Fire may spread if connection concrete duct is incorrectly installed.
  • Page 16 9 Housing installation Lower part of housing DANGER Risk of incorrect installation if Cable grommet non-permitted mounting material is used. Metal connection socket with shut-off Only secure connection duct to ceiling with per- device mitted mounting material (duct clamp or clamping band).
  • Page 17: Electrical Connection

    10 Electrical connection 10 Electrical connection Lower part of housing DANGER Danger from electric shock/The Cable grommet unit will be damaged if installed incorrectly Power cable with too long a power cable. If the cable feed is too long inside the housing, Connection terminal the fan insert cannot be installed correctly.
  • Page 18: Installation Of Spiral Housing And Upper Part Of Housing

    1. Press the desired number of sealing plugs out of the housing. 5. Check that all screw connections are tight. Centro-M-APB with fixed air volume setting. 6. Check ventilation ducts for dirt and clean if ne- Centro-E-APB and Centro-H-APB with fixed cessary.
  • Page 19: Commissioning

    Degree of protection is not guaranteed if in the wrong installation position. 2. Run function test. To do this, switch unit on Only fit upper part of housing with the Maico and off, observe delay times (for control mod- name in the bottom right.
  • Page 20: Fault Rectification

    14 Removing the housing Filter change 14 Removing the housing Filter change interval every 3 to 6 months, 4 Fan insert 36 Locking tabs depending on the degree of soiling. 37 Locking lever 38 Locking tabs 1. Remove cover. 1. Switch off mains fuse, secure and fit warning 2.
  • Page 21: Spare Parts

    In case of questions, please contact: in full load operation. switches from full load Maico Elektroapparate-Fabrik GmbH operation to base load Steinbeisstraße 20 operation after an over- 78056 Villingen-Schwenningen, Deutschland run time of 15 minutes Tel.
  • Page 22: System And Accessory Components

    18 System and accessory components 20 Wiring diagrams DANGER Danger to life from electric shock. 20.1 Wiring diagrams Prior to accessing the connection terminals, switch off all supply circuits. Switch off mains Centro-E-APB fuse, secure against being accidentally switched back on and position a visible warning sign. 1.
  • Page 23 20 Wiring diagrams The exhaust air element then automatically Centro-H-APB switches back to base load operation. Demand- based ventilation automatically or via a switch (for example light switch). After manual switch-on (light switch) the exhaust air element runs with a start delay of approx. 1 minute with demand-based ventilation (full load).
  • Page 24 Maico Elektroapparate-Fabrik GmbH Steinbeisstr. 20 78056 Villingen-Schwenningen Deutschland Service +49 7720 6940 info@maico.de D11.21_EN_DSW-AV...

This manual is also suitable for:

Centro-e-apbCentro-h-apb

Table of Contents