Visual Check; Schritt 1 - System Operation - EC POWER XRGI 6 Maintenance Instruction

Hide thumbs Also See for XRGI 6:
Table of Contents

Advertisement

VISUAL CHECK

3. VISUAL CHECK
STEP 1 – SYSTEM OPERATION
CHECKING IN THE SERVICE DATABASE
Check the runtime of the XRGI
https://service.ecpower.dk
Locate the desired XRGI
®
®
by typing the XRGI
-ID or object name.
CALL DETAILS
Click on the icon
List of
Click on one
Time of call
Check in particular for:
most recent events/alarms.
length of operating times (under 10 minutes per start implies insuffi-
cient heat dissipation) or hydraulic problems.
STORAGE STATUS
Click on the icon
Heat
status.
Check for abnormalities with the storage status of previous switching points.
Please pay special attention to the following:
Is the TMV set point compensated (displayed as an operational set
point below the actual value)?
Are all temperatures shown in the service database and are the figures
viable?
Is the T-Return permanently below 65 °C (max. 70 °C)?
The temperature difference between TMK - TLK is ≤ 8K at full load
when operationally warm?
OPERATING ANALYSIS
In the left menu, click on
fields a period for the desired operational analysis. Click on
Check for abnormalities in the operating analysis:
- Frequent faults
- Manual switching on site
- Operating time within the reference range
SOFTWARE VERSION
Check the software version of the XRGI
Whether a new software is available for the XRGI
in the service database with the icon
System list
as well as
®
system in the EC POWER service database –
system in the search field in the service database
 
calls.
to get a detailed data of that call.
Distributor, to get an overview of the storage
Operational analysis
and enter in the 2 search
 
®
system.
®
system is displayed
under
System
Unit
list.
Get
data.
configuration,
6
Fig. 3.01
Fig. 3.02
Fig. 3.03
Fig. 3.04
Fig. 3.05
Fig. 3.06
Fig. 3.07

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xrgi 9Xrgi 15Xrgi 20

Table of Contents