Install Cassette (Landed Wires)
Danger
Ensure only qualified personnel install, operate, service and maintain all electrical
equipment.
Fig 53 shows the front view of the AKD-5 cassette, ready for installation
Figure 52 & 53
Figure 54
2TSA451011P0000 Rev-B
Fig 52. Cassette Projected from Switchgear
Switchgear and Cassette assembly (Front View)
It must be ensured that the supply power to
the
compartment
compartment is de-energized for all the
incoming and outgoing circuits of the LVS
prior to any work being conducted on it.
During the installation and related work on
the equipment, it must be ensured that the
operator is using the prescribed PPE for the
specified tasks.
AKD-5, AK50
Fig 53. Cassette racking on Switchgear rails
is
turned
off/
© 2020 Emax 2 Retrofill Circuit Breakers 600A-4000A | 29