Monogram Advantium CSB912 Installation Instructions Manual page 7

Built-in wall oven
Table of Contents

Advertisement

Available languages

Available languages

PREPARE THE OPENING
Installation over another Advantium Built-In
Oven:
27 or 30
25-1/4
17-1/2
17-1/2
• If you are mounting a Built-In Advantium Oven over
another, use the dimensions shown. The middle rail
separating the two openings may need to be larger
than the 3-1/8 minimum shown.
31-2000355 Rev.2
Standard Installation Preparation
(CONT.)
Construct
23-1/2
solid bottom - Min.
3/8" plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
3 1/8 Min.
(4 1/8 Recommended)
PREPARE THE OPENING
Installation under a Microwave Oven and over
a Warming Drawer:
27 or 30
23-1/2
25-1/4
Per Microwave
Oven Requirement
17-1/2
Per Warming
Drawer
Requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting the
cabinet load, in addition to the added weight of the
oven and drawer, plus additional oven loads.
(CONT.)
Construct
solid bottom - Min.
3/8" plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
3.5 Min.
(4.5 Recommended)
2 Min.
(3 Recommended)
7

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Advantium csb912p2ns1Advantium csb912m2ns5

Table of Contents