Installation Of The Tilting Detect Switch - Mitsubishi Electric PLK-J2516-YU Technical Manual

Industrial sewing machine
Table of Contents

Advertisement

(7) Attach the cover (No.11) to the gas spring unit with the screws (No.12).
<11>
<12>

3-9. Installation of the tilting detect switch

(1) Install the switch units (No.1) with the Screws
(2) Adjust the switch units (No.1) position so that the machine table push the switch when the machine
head in initial position and turns on the switch.
NOTE The switch unit (No.1) is temporarily fixed at the back side of the sewing machine bed. Fix it to the
proper place as shown on the below figure.
Snap!
[Notice] if the switch is not turned on, error [M-038] will occur.
From the library of Superior Sewing Machine & Supply LLC - www.supsew.com
(No.2).
<1>: Switch units
<2>
<2>: Screw (two screws)
<1>
- 7 -
<11>: Cover
<12>: Screw (six screws)

Advertisement

Table of Contents
loading

Table of Contents