Connection Of The Air Tube; Installation Of The Filter Regulator And Air Piping - Mitsubishi Electric PLK-J2516-YU Technical Manual

Industrial sewing machine
Table of Contents

Advertisement

3-11. Connection of the air tube

3-11-1. Installation of the filter regulator and air piping

(1) Attach the air presser regulator assembly (No.1) underneath the table with the wood screws (No.2).
The prepared holes are provided for the wood screws on the rear surface of the table.
(2) Cut the part of sizeφ8 air tube (No.3) enclosed in the accessory box into about 1 meter length then,
insert one end of this air tube into the intake air fitting (No.8) of the magnet valve assembly (No.7) The
magnet valve assembly (No.7) is located at the left side surface of the sewing machine head. Beside,
pass the other end of the air tube (No.3) through the cut out hole of the table top then, insert it into the
air outlet fitting (No.5) of the air presser regulator (No.1).
(3) Insert the one end of the resting air tube into the intake air fitting (No.4) of the air coupling to be
adopted with the air supply source provided in your factory. One of the air couplings (No.6) is
enclosed in the accessory box.
<6>
<8>
<7>
From the library of Superior Sewing Machine & Supply LLC - www.supsew.com
<3>
<2>
<5>
<1>
<4>
<3>
Air presser regulator
- 14 -
<1>: Air presser regulator unit
<2>: wood screw (two screws)
<3>: Air tube (sizeφ8)
<4>: Intake air fitting
<5>: Air outlet fitting
<6>: Air coupling
<7>: Magnet valve assembly
<8>: Intake air fitting

Advertisement

Table of Contents
loading

Table of Contents