Installation and operation manual

6. Maintenance and servicing

DANGER
Insufficient qualification
Inappropriate handling due to insufficient qualification can lead to serious property damage and
personal injuries or death.
Recommendation: Annually
Respective set of wear parts:
BEKOMAT
®
8
2000450
BEKOMAT
®
9
4005382
Before all maintenance:
Shut off the supply line
Press the TEST button until the BEKOMAT
Disconnect the BEKOMAT

6.1. Maintenance schedule

Maintenance
Functional test
Press the TEST button
Visual inspection
Maintenance
Replace the set of wear parts
Leakage test
Functional test
Check adhesive labels and replace if necessary
Check length of valve core
Check cable connections
Cleaning
Functional test:
The BEKOMAT
should be tested daily for flawless function.
®
To check the solenoid valve, press the TEST button briefly (approx. 2 sec.).
 The BEKOMAT
starts manual drainage.
®
To check the fault signal, shut off the condensate inlet and press the TEST button for approx. 1 minute.
 The BEKOMAT
starts manual drainage and triggers the alarm.
®
i
During this test, larger quantities of compressed gas can flow into the condensate collecting line.
Maintenance:
Further information about maintenance will be provided on request.
20
Maintenance work may only be carried out by trained service personnel from BEKO TECHNOLOGIES
GmbH or authorised partners.
is pressureless
®
from the mains voltage
®
daily
annually
Interval
BEKOMAT
EN
8/9
®