Cisco C1000-8T-2G-L Installation Manual page 32

8-port and 16-port switch hardware
Table of Contents

Advertisement

Wall-Mounting
Step 3
Peel the adhesive strip off the bottom of the screw template.
Step 4
Attach the screw template to the wall.
Step 5
Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the two screw template slots.
Step 6
Insert two screws in the slots on the screw template, and tighten them until they touch the top of the screw
template.
Figure 13: Installing the Mounting Screws on the Wall
Step 7
Remove the screw template from the wall.
Step 8
Place the switch onto the mounting screws, and slide it down until it locks in place.
Cisco Catalyst 1000 Series 8-Port and 16-Port Switch Hardware Installation Guide
22
Switch Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents