ccei LIMPIDO LTE DUO User Manual

Advertisement

Quick Links

Simply Enjoy Water
WARNING : READ CAREFULLY
THESE INSTRUCTIONS BEFORE
INSTALLING, PUTTING INTO
SERVICE OR USING THIS DEVICE.
Modification
INDICE
LIMPIDO LTE DUO
A
02/2007
User manual V1.0
Contents
DATE
----------------------------------------------------------------------------------------------------------------------------------------------------------2
PRESENTATION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------2
. . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
pH regulation . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
DESCRIPTION OF EQUIPMENT -----------------------------------------------------------------------------------------3
Electrolysis cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Circulation detector (Flow-switch) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
pH probe. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
OPERATION -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------3
Electolyse . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Production indicator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Checking salt level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
pH regulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
INSTALLATION ----------------------------------------------------------------------------------------------------------------------------------------------------------------------- 5
hydraulic installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Electrical installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
pH probe installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
STARTUP -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 7
Adjusting the production level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Stabiliser . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
pH control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
MAINTENANCE -------------------------------------------------------------------------------------------------------------------------------------------------------------------- 7
Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Wintering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Adding salt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
®

Advertisement

Table of Contents
loading

Summary of Contents for ccei LIMPIDO LTE DUO

  • Page 1: Table Of Contents

    Adding salt ............8 Modification INDICE DATE LIMPIDO LTE DUO 02/2007...
  • Page 2: Caracteristics

    (pH-). Really easy to use, LIMPIDO LTE DUO has 4 predetermined setpoint : 7 / 7,2 / 7,4 / 7,6. The user must calibrate the probe during the initial operation of the device (see. Operation ).
  • Page 3: Description Of Equipment

    WATER FLOW DETECTOR (FLOW-SWITCH) The flow-switch, provided with the LIMPIDO LTE DUO prevents the electrolyser from operating if there is no flow or during backwashing. It prevents the risk of any accumulation of hydrogen or over-heating, thus ensuring the safety of the device.
  • Page 4: Operation

    The production indicator provides you with an estimation of the salt level: place the adjustment knob on the min. position and make sure the display is in the green zone. If the measured value is outside the normal range, refer to the maintenance chapter. User Manual LIMPIDO LTE DUO V1.0...
  • Page 5: Ph Regulation

    Installation SIDE VUE tank from FILTER To the pool and heater equipment Installation TOP VUE LIMPIDO LTE DUO ® Output Intake NOTE : The LIMPIDO -LTE DUO should be installed after a heater ® User Manual LIMPIDO LTE DUO V1.0...
  • Page 6: Electrical Installation

    The conductivity of water is proportional to the salinity but also depends on the temperature (2,2%/°C). Lack of salt Too much salt At 30°C the salt level max i s 5g/l à 3,9g/l 5°C 10°C 15°C 20°C 25°C 30°C 35°C 40°C DÉAL salinity g/l User manual LIMPIDO LTE DUO V1.0...
  • Page 7: Adjusting The Production Level

    4g/l. Depending on the level of salt measured, the quantities of salt to be Salt weight in kg to add for reach 4g/l added are as follows : User manual LIMPIDO LTE DUO V1.0...
  • Page 8 Date of sale :............................Serial No.:............................Declaration of conformity ® The company CCEI SA (FR 1507 073 804 973) hereby declares that the Limpido LTE DUO product meets with the safety and electromagnetic compatibility of European Directives 73/23/CEE and 89/336/CEE.

Table of Contents