Securing The Cables; Interconnecting Instruments - Simrad IS80 Manual

Wind instrument
Hide thumbs Also See for IS80:
Table of Contents

Advertisement

Securing the cables

Use the eclosed tie wrap to secure the cables to the
instrument.

Interconnecting instruments

Interconnect a series of instruments by using a SimNet
power cable with termination and T-joiners as illustrated
below.
Instrument
Supply
SimNet
Supply
(Red disk)
If the instruments are connected to other SimNet
compatible products, refer to the manual for those
products.
Use only 12V as SimNet supply!
12-24V
12V
SimNet
T-joiner
SimNet
SimNet
T-joiner
T-joiner
Installation | 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wi80

Table of Contents