Dimensional Drawings; I Nstallation And Putting Into Operation - Level Pro ULTRAPRO 1000 Instruction Manual

Ultrasonic level meters, reliable non-contact level
Table of Contents

Advertisement

4 .  D
iMensional Drawings
UPS-1000-02
Pg11 cable gland
Ground terminal
UPS-1000-20
5 .  i
nsTallaTion anD puTTing inTo operaTion
This procedure includes the following three steps.
i
nsTallaTion
e
lecTric connecTion
s
eTTing
© Levelpro, s.r.o.
UltraPro-1000
UPS-1000–06
variant  UPS -with protective 
conductor
UPS-1000–10
4

Advertisement

Table of Contents
loading

Table of Contents