Setting Up the Ground Speed
Control Levers
1. Loosen (do not remove) the hardware securing the
ground speed control levers to the lever bases.
2. Raise the levers, aligning the upper hole in each lever
with the upper slotted hole in the lever base.
20-23 N.m.
15-17 ft. lbs.
Figure 7. Setting up the ground speed levers
C
A
7
3. Install the noted hardware as shown in Figure 7.
Tighten all hardware. Torque to 15-17 ft. lbs. (20-23
N.m.).
Note: Ground speed control levers must be adjusted
prior to use. Refer to the Section 'Ground Speed
Control Lever Adjustment' in the Operator's Manual.
A
B
B
C
Axion / 150Z Series
5/16-18
5/16-18
x 1-3/4