3> <3> Installation Installation - S&A CW-6080 User Manual

Industrial chiller
Hide thumbs Also See for CW-6080:
Table of Contents

Advertisement

<3>
<3>
Installation
Installation
<3>
<3> Installation
Installation
It It It It i i i i s s s s very
very
very simple
very
simple to to to to install
simple
simple
first
first
first
first time
time
time of of of of the
time
the new
the
the
new
new
new machine
1. 1. 1. 1. Open
Open
Open
Open the
the
the
the package
package
package
package to to to to check
accessories
accessories
accessories are
accessories
are
are
are completed.
2. 2. 2. 2. Open
Open
Open
Open the
the
the
the injection
injection
injection
injection port
Observing
the
Observing
Observing the
Observing
the water
the
have
the
water
have
have the
have
the water
the
water overflowed!
water
water
should
be
water
water
water should
should be
should
be added
be
( ( ( ( anti-corrosion
anti-corrosion
anti-corrosion
anti-corrosion water
noncorrosive
noncorrosive
antifreeze
antifreeze
noncorrosive
noncorrosive antifreeze
antifreeze fluid.
3. 3. 3. 3. According
According
According
According to to to to system
system
system
system conditions,
well.
well.
well.
well.
4. 4. 4. 4. Plug
Plug
Plug
Plug in in in in power,
power,
power,
turn
turn
power, turn
turn on
water
water
tank!)
tank!)
water
water tank!)
tank!)
(1)
(1)
Power
Power
switch
switch
turned
turned
(1) Power
(1)
Power switch
switch turned
turned on,
first
first
time
time
time of of of of operating
operating
operating
first time
first
operating may
alarming occasionally,
alarming
alarming
alarming
occasionally,
occasionally,
occasionally, but
normal.
normal.
normal.
normal.
(2) After
(2)
(2)
(2)
After
After
After the
the
the
the first
first
first
first boot,
boot,
boot,
boot, you
(3) Power
(3)
(3)
(3)
Power
Power
Power switched
switched on,
switched
switched
that fans
that
that
that
fans
fans
fans and
and
and
and other
other
other components
other
controller
controller will
controller
controller
will
will automatically
will
automatically
automatically
automatically control
magnetic valve,
magnetic
magnetic
magnetic
valve,
valve,
valve, fans
fans
fans and
fans
(4) As
(4)
(4)
(4)
As
As
As it it it it takes
takes
takes a a a a longer
takes
longer
longer
longer time
according
according to to to to different
different
according
according
different
different conditions,
do
not
turn
off
the
do
do not
do
not
not turn
turn
turn off
off
off the
the
the power
5. 5. 5. 5. Check
Check
the
water
Check the
Check
the
the water
water
water level
The
The
first
first
startup of of of of the
startup
startup
The first
The
first startup
slight
slight
water
water
level
level
slight water
slight
water level
level decline,
it it it it' ' ' ' s s s s allowed
allowed
allowed to to to to add
allowed
add
add
add adequate
water
water
level,
level,
and
and
water
water level,
level, and
and inspect
the
the
water
water
level
level
drops
drops
the
the water
water level
level drops
drops obviously,
6. 6. 6. 6. Adjust
Adjust
Adjust
parameters
parameters
parameters of of of of temperature
Adjust parameters
CW-
CW-
6080
6080/ / / / 6180
6080
6180
6180
6180/ / / / 6280
6280
6280
CW-
CW-6080
6280 series
need
need
need to to to to adjust
adjust
adjust
adjust it. it. it. it. If If If If it it it it is is is is really
need
status
status
status
status and
and
and
and parameters
parameters
parameters
parameters adjustment.
install
install this
install
this
this
this industrial
industrial
industrial
industrial cooling
machine can
machine
machine
can
can
can be
be
be
be carried
carried
carried
carried out
check
check
check if if if if the
the
the machine
the
completed.
completed.
completed.
port
port
port to to to to feed
feed cooling
feed
feed
cooling
cooling water.
cooling
water
level
gauge
water level
water
level
level gauge
gauge
gauge and
overflowed!
For
the
overflowed! For
overflowed!
For
For the
the cooling
the
added
an
appropriate
added
added an
an
an appropriate
appropriate amount
appropriate
water
water
aqua). . . . Working
aqua)
aqua)
Working
Working
Working in in in in cold
water aqua)
fluid.
fluid.
fluid.
conditions,
conditions,
please
please
conditions, please
please connect
on
on
the
the
power
power
switch.
switch.
on the
the power
power switch.
switch. (Do
on,
on,
the
the
circulation
circulation
on, the
the circulation
circulation pump
may
may
cause
cause
more
more
may cause
cause more
more bubbles
but
but
but running
running
running
running for
you must
you
you
must
must
must immediately
immediately
immediately
immediately check
on,
on, if if if if the
on,
the
the
the water
water temperature
water
water
temperature
temperature
temperature is is is is below
components
components
components of of of of the
control
control
control the
and other
and
and
other
other
other parts
parts
parts
parts based
time
time to to to to start
time
start
start
start over
over
over
over the
conditions,
the
conditions, the
conditions,
the
the time
power
and
again
on
power
power and
and
and again
again
again on
level
level in in in in the
the
water
tank.
level
the water
the
water tank.
water
tank.
tank.
the
the
new
new
chiller
chiller
the new
new chiller
chiller empties
decline,
decline,
but in in in in order
but
but
order
order
order to to to to keep
decline, but
adequate
adequate
water
water
again.
again.
adequate water
water again.
again. Please
inspect
inspect
inspect it it it it again
again
again
after
after
again after
after the
obviously,
obviously,
please
please
obviously, please
please re-inspect
temperature
temperature
controller.
controller.
temperature controller.
controller.
series
series
use
use
an
an
intelligent
intelligent
series use
use an
an intelligent
intelligent thermostat.
really
really
necessary,
necessary,
really necessary,
necessary, please
adjustment.
adjustment.
adjustment." " " "
CW-
CW-
CW-
CW-6080
cooling
cooling
cooling machine.
machine.
machine. The
machine.
out by
out
out
by
by
by following
following
following steps:
following
machine is is is is intact
machine
machine
intact
intact and
intact
water.
water.
water. (Do
(Do
(Do
(Do not
not let
not
not
let
let the
let
and
adding
water
slowly,
and
and adding
adding
adding water
water slowly,
water
slowly,
slowly, be
cooling
cooling of of of of carbon
carbon
cooling
carbon
carbon steel
amount
amount of of of of cooling
amount
cold
cold
north
north
cold north
north area,
connect
connect
the
the
water
water
connect the
the water
water inlet
(Do
(Do
not
not
start
start
(Do not
not start
start up
pump of of of of the
pump
pump
the
the
chiller
chiller
the chiller
chiller starts
bubbles
bubbles
bubbles in in in in the
the
the
the pipe
for a a a a few
for
for
few minutes
few
few
minutes
minutes
minutes later,
check
check
check whether
whether
whether
whether the
below
below
below the
the
the
the set
the machine
the
the
machine
machine
machine do
do not
do
do
not
not
not work.
the
the
the working
working
working
working conditions
conditions
conditions of of of of the
conditions
based
based
based on
on
on
on the
the
the
the set
set controlling
set
set
controlling
controlling parameters.
controlling
the
the compressor
the
compressor
compressor and
compressor
time
time is is is is range
range
from
time
range from
range
from seconds
from
frequently.
on
on frequently.
frequently.
frequently.
empties
empties
the
the
air
air
air in in in in the
the
the
empties the
the air
the water
keep
keep
the
the
water
water
keep the
the water
water level
Please
Please
observe
observe
Please observe
observe and
the
the
chiller
chiller
running
running
the chiller
chiller running
running for
re-inspect
re-inspect
the
the
water
water
re-inspect the
the water
water pipeline
thermostat.
thermostat.
thermostat. Normally
please
please
refer
refer to to to to page
refer
please refer
5
6080
6080/ / / / 6180
6080
6180/ / / / 6280
6180
6180
6280 S S S S eries
6280
6280
eries
eries
eries
The
The installation
The
installation for
installation
installation
for
for the
for
steps:
steps:
steps:
and
and
and all
all the
all
all
the
the necessary
the
necessary
necessary
necessary
the water
the
the
water
water
water spill
spill
spill over!)
spill
over!)
over!)
over!)
be
careful
not
not to to to to
be
be careful
careful
careful not
not
steel
equipment,
steel equipment,
steel
equipment, the
equipment,
cooling
water
additive
cooling
cooling water
water
water additive
additive
additive
area, it it it it' ' ' ' s s s s better
area,
area,
better
better to to to to use
better
inlet
inlet
and
and
outlet
outlet
inlet and
and outlet
outlet pipe
up
up
without
without
water
water in in in in the
water
up without
without water
starts
starts
working.
working.
starts working.
working. The
pipe
pipe
leading
leading to to to to a a a a flow
leading
pipe leading
later,
later,
later, it it it it will
will
will
will go
go
go
go back
back
back
back to to to to
the
the
the water
water
water
water pipe
pipe
pipe leaks.
pipe
leaks.
leaks.
leaks.
set
set
set value
value, , , , it it it it is is is is normal
value
value
normal
normal
normal
work. The
work.
work.
The
The
The temperature
temperature
temperature
temperature
the
the
the compressor,
compressor,
compressor,
compressor,
parameters.
parameters.
parameters.
and
and other
and
other
other
other components,
components,
components,
components,
seconds
seconds to to to to minutes,
minutes,
seconds
minutes, so
minutes,
water
water
pipe,
pipe,
leading a a a a
leading
leading
water pipe,
pipe, leading
level in in in in the
level
level
the
the
green
green
the green
green area,
and
and
record
record
the
the
current
current
and record
record the
the current
current
for
for
for a a a a period
period of of of of time,
period
period
time,
time,
time, if if if if
pipeline
pipeline
leakage.
leakage.
pipeline leakage.
leakage.
Normally
Normally
users
users
do
do
Normally users
users do
do not
page
page
17
17
17, , , , " " " " Operating
Operating
Operating
page 17
Operating
the
the
the
the
the
the
use
use
use
pipe
pipe
pipe
the
the
the
The
The
The
flow
flow
flow
so
so
so
area,
area,
area,
not
not
not

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Cw-6180Cw-6280

Table of Contents